Get a quote

Seven steps. Each one leaves a record.

From the first scoping call to the agreed retest, every step produces something you can keep, share or check.

The engagement, step by step

  1. 01 · Scope record

    Scoping call

    We walk through the system, the reason for testing and who needs the result. We ask about roles, tenants, integrations and environments rather than asking for a complete inventory up front.

    You provide: A product walkthrough and the requirement behind the test

  2. 02 · Signed authorisation

    Written scope and authorisation

    The proposal states assets, roles, test window, rules of engagement, exclusions and retest terms. The owner of the system signs authorisation before any testing begins.

    You provide: Sign-off from the system owner

  3. 03 · Access checklist

    Access and test accounts

    We confirm test accounts for every in-scope role, environment URLs, API documentation and any allow-listing. Missing access reduces coverage, so we check it before the window opens.

    You provide: Accounts per role, environment details, API docs

  4. 04 · Critical-issue escalation

    Testing window

    Manual, authenticated testing against the scope record. Anything that looks critical is escalated to your named contact through the route agreed in the rules of engagement, rather than held for the report.

    You provide: A contact who can answer questions during testing

  5. 05 · Report and evidence

    Report

    Every finding carries evidence, affected roles, a severity rationale and remediation guidance. The summary is written so your client or customer’s reviewer can read it in minutes.

    You provide: Who should receive the report

  6. 06 · Engineer walkthrough

    Readout

    A walkthrough with the engineers who will fix the issues, findings first. Questions about root cause and remediation approach are answered here.

    You provide: The engineers who own the fixes

  7. 07 · Verification ledger

    Retest

    Agreed fixes are retested and the verification ledger in the report is updated, so a reviewer can see what was fixed and when. Retest rounds and timing are set in the proposal.

    You provide: A list of fixes ready for verification

Principles we hold to

Written scope before testing

Assets, roles, environments, exclusions and rules of engagement are agreed and signed by the system owner. An enquiry never authorises testing.

Manual, authenticated testing

Tools help with discovery. Every reported finding is confirmed by hand and backed by evidence your engineers can reproduce.

Evidence over adjectives

Each finding carries a request and response, the affected roles, a severity rationale and a specific fix.

Critical issues escalated early

If something looks critical during testing, your named contact hears about it through the route agreed in the rules of engagement, not only in the report.

Reports for two readers

A summary your client or customer’s reviewer can read in minutes, and detail your engineers can act on.

Agreed fixes retested and recorded

Where the proposal includes a retest, fixes are retested and the verification ledger is updated in a new report version.

The method behind it

All methodology chapters

Questions buyers ask

Who carries out the testing?

The assessment lead and any additional tester are named in your proposal, together with who reviews the report before it is issued. We do not publish team details that have not been confirmed.

Do you test in production?

Usually in a staging environment that matches production. Where production testing is needed, the rules of engagement set limits on timing, data and techniques.

How do you handle our data and credentials?

Test accounts and evidence are handled under the data-handling terms in your proposal. We ask for test accounts, never personal credentials, and we keep evidence to what the report needs.

What happens if you find something serious?

Stop conditions and escalation contacts are agreed in the rules of engagement. Critical issues are escalated to your named contact through that route rather than held for the report.

How many retests are included?

One round on the reported findings in every package: within 60 days for a focused test, 90 days for a product test, and after each window in a release programme.

Can the report be shared with our customer or client?

Yes. The report is written to be shared, and the summary is designed for reviewers. Who receives it is agreed before testing.

Get a fixed quote for your release.

A short form about the product and the deadline. We reply with scoping questions, then a fixed written quote.